Here are simple steps to get you started.
How to lay roofing felt in a valley.
Lay the felt paper from the top of the roof valley to the eaves at the roof edge.
You can use a straight edge to achieve a straight cut.
If it gets wet it will wrinkle making it harder to shingle.
Chalk lines should be snapped 33 5 8 above the eave line.
If you live in an area with inclement weather you should consider using a special ice and water protector.
Felt works just fine.
You want to lay the shingles from the bottom to the top of the valley.
Then your first shingle goes on the side you are going to cut.
Felt if you plan to leave the paper exposed for more than a couple of days because it wrinkles less then 15 lb.
Felt doesn t tear as easily so it s safer to walk on when you re working on steeper pitches.
Overlap each row at least 3 to 4 inches.
Over driving nails is always a.
How to install felt underlayment for a new roof.
Drip edges on the eaves any valley liners and all flashing should be installed before the tar paper is laid.
Start by overlapping a starter from both sides of the valley at the bottom.
While laying felt is not an easy job it can be done by anyone who has the patience to deal with it.
Installing a roof is much more than just nailing shingles onto some boards.
Use a broad strip of felt paper.
For an apex roof start at the bottom and lay it horizontal the next should overlap as in video so the water runs over the join as it runs off the roof finishing at the apex or top of roof.
For most applications 15 lb.
Check to ensure the roof is in good enough condition to walk over.
The next one goes on the low side.
It starts with installing solid decking usually plywood or oriented.
Start by laying asphalt felt or other underlayment over the roof.
Do not use felt as a temporary protection against rain.
Felt is laid on a flat roof to help keep the roofing system waterproof.
Start at the top.
The last layer should go over both sides of the roof overlapping both side covered in felt.
Install new flashing metal flashing is often called drip edge along the.
When you reach the valley lay the shingles over the valley and trim the edges to the chalk line.
Weave and cut the valley on the highest side of the roof.
After this lines should be snapped every 34 as you move up the roof.
Before laying roof felt all rotten decking must be replaced.
You can center it and align it smoothly with the roof contours as you go down.
When working with a helper expect to spend several hours to install drip edge wsu and roofing felt on a medium sized roof.
Using your staple gun secure the felt to the roof.
If you need to temporarily protect a roof cover it with plastic sheeting or a tarp.
Begin to install roof shingles on either roof face.
Step 1 prep work.